Stopped by the building this afternoon.  I was pleasantly surprised when I walked in.  Usually there are stacks of sheetrock and AC ducts in the lobby that take up a lot of room.  However, today it was completely empty and the floor was swept.  The ceiling grid was in place and all walls were completed.  I asked Melvin our Construction Foreman what was going on.  He said we were getting ready to start putting the flooring in!

It's amazing how quickly things are moving along.  Here are some bullets of other things I noticed that were completed.
  • The entire sound/media booth is sheetrocked and looks like it's part of the room now.
  • Entire stage is completed, including the closets and the equipment ramp that leads down to the green room back stage.
  • All recessed lighting cans are in place throughout the lobby.  You can really start to see how this area is going to look!
  • All floors have been swept and are being prepped for covering.
Other things that happened last week.
  • Our chairs were ordered and will be here right on time!
  • Our stage curtains are being designed and are set to be installed exactly on time!
  • Our building sign is being finalized and is set to be installed on time.
Check back later this week to see some pictures of the progress!